The four types
When to use which
- Version — use for manufacturing-method changes that do not require a new item revision or stock phase-over.
- Revision — the part is formally revising (new drawing revision, new dimension) and you want old and new
to coexist while stock phases over. This is the everyday engineering-change case. You can name the revision
(for example
A) when you add the item, or leave it blank to take the next revision automatically. - Replacement Part — use for a one-to-one replacement with a new part number derived from the old part.
- New Part — you’re introducing a genuinely new part under change control, with no old part behind it. Nothing is superseded. This is also how a consolidation is modeled: when several components collapse into one, the consolidated “1” is added as a New Part and the old lines are dropped from the parent assembly’s draft BoM.
What each type gates
Change type also controls the editable surface on the affected item:- Version exposes the Bill of Material and Bill of Process editors on the draft method.
- Revision, Replacement Part, and New Part add Part Properties (attributes) and documents on top of BoM and BoP, because each is producing a genuinely new item, not just a new recipe.