Dispatches
A maintenance dispatch records the problem, work center, assignee, time, and parts. It uses this lifecycle:What it’s against
A dispatch is attached to a work center and a required location — the machine being maintained. The Takes work center offline option also moves the work center’s downtime window in the schedule.Preventive schedules
A maintenance schedule (Resources → Maintenance → Schedules) defines a work center, location, frequency (Daily, Weekly, Monthly, Quarterly, or Annual), priority, estimated duration, required parts, an optional procedure, and a Next Due Date. A background job runs daily at 06:00 UTC and creates an Open dispatch for each active schedule whose next due date has arrived. The dispatch has sourceScheduled, severity Preventive, and a copy of the scheduled parts. Daily schedules can select weekdays and Skip Holidays. A schedule with Takes Work Center Offline needs an estimated duration; that window is taken out of the work center’s capacity in scheduling.
Blocking and OEE impact
Each dispatch declares its OEE impact:Down, Planned, Impact, or No Impact. This is an availability gate, not a metric.